-
Try a Filter!
CIPP Cleaning HDD Inspection Investigation Lining Lining with Close-Fit Pipes Lining with Continuous Pipes Lining with Spirally-Wound Pipes Microtunnelling Occupational Safety Open-Cut Method Pipe Jacking Planning and Design Rehabilitation Renovation Repair Repair by Injection Replacement Trenchless Construction Utility TunnellingFachbereiche
Arbeitssicherheit Baugrund Beurteilung CIPP Dichtheitsprüfung Erneuerung Geschlossene Bauweise (Neubau) HDD Inspektion Mikrotunnelbau Offene Bauweise (Neubau) Planungsprozesse Reinigung RenovierungReparatur Reparatur durch Injektion Reparatur durch Spachtelverfahren Rohrstranglining Rohrvortrieb Sanierung Schlauchlining Untersuchung WickelrohrliningWelcome to multiE-Learning.com
Herzlich willkommen auf multiE-Learning.de
Skip all content
All Content
The renovation of sewers and pipelines with "Lining with cured-in-place pipes" is an established standard construction method, starting with the planning process, through material production and installation, right up to checking the quality achieved. It is characterized by a wide range of applications and a high variance in the fabrication and application processes.
This module teaches the essential basics in relation to the fabrication of the lining tube and its installation.
LEARNING OUTCOMES
- Knowing range of application of tube lining
- Identifyinfg damage patterns and application limits;
- Knowing requirements on materials, resin systems and carrier material;
- Awareness of curing processes and procedures.
Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: STEIN Ingenieure GmbH
The renovation of sewers and pipelines with "Lining with cured-in-place pipes" is an established standard construction method, starting with the planning process, through the production of materials and installation, right up to checking the quality achieved. It is characterised by a wide range of applications and a high variance in the fabrication and application processes. This module gives a detailed overview of the installation and curing processes in lining tube. Thus, this module creates the basis for an optimal process selection within the planning process and provides essential basic knowledge for construction supervision.
This module requires knowledge of the module "Lining with cured-in-place pipes – Basics".
LEARNING OUTCOMES
- understanding the wall construction of the lining tube;
- knowing possible uses and applications of CIPP liner;
- ability to conduct preparatory work, select installation variants and the curing process;
- knowing advantages and disadvantages of the various curing methods and requirements for structural verifications.
Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: STEIN Ingenieure GmbH in cooperation with SAERTEX multiCom GmbH / 2023
The module "Details on the Installation of Lining with UV Cured-in-Place Pipes” is based on the ordering and installation manual SAERTEX-LINER® for gravity pipes and sewers by SAERTEX multiCom GmbH. This module describes the essential work steps, starting with site preparation, continuing with the installation of the lining tube, the curing and, finally, the essential finishing work.
Note: Specific numerical values in this module apply to products from SAERTEX multiCom GmbH and are not readily transferable to products from other manufacturers.
LEARNING OUTCOMES
- Ability to conduct curing of the lining tube with regard to logging, working pressure, positioning of the light source, ignition schemes for various UV light sources;
- Knowing requirements for special rehabilitation conditions, such as special profiles, bends, and nominal diameter changes.
Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: STEIN Ingenieure GmbH in cooperation with SAERTEX multiCom GmbH / 2023
The renovation of sewers and pipelines with "Lining with cured-in-place pipes" is an assured standard construction method, starting with the planning process, through the production of materials, the installation, right up to checking the quality achieved. It is characterised by a wide range of applications and a high variance in the fabrication and application processes. This module teaches essential basics with regard to the required finishing work including the taking of samples, their testing for the acceptance of the rehabilitation performance and gives an overview of rehabilitation defects and their handling.
This module requires knowledge of the modules “Lining with cured-in-place pipes - Basics” and " - Processes” as a prerequisite.
LEARNING OUTCOMES
- Knowing procedures and process steps for connecting the CIPP liner to manholes and structures and lateral pipes;
- Ability to identify quality influences during installation and
- Knowing required tests for approving the professional installation of the CIPP liner.
Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: STEIN Ingenieure GmbH
A virtual construction site to demonstrate the rehabilitation of a DN 400 concrete sewer section via lining with UV CIPP (product name: SAERTEX-LINER® MULTI, type S+ Standard). The aim of the rehabilitation measure was the static strengthening and the restoration of the tightness of the old sewer.
Editor: Prof. Dr.-Ing. Stein & Partner GmbH and SAERTEX multiCom GmbH
Rehabilitation of a DN 400 concrete sewer section with “Lining with Cured-In-Place Pipes” (product name: SAERTEX-LINER® MULTI, type S+ Standard). The aim of the rehabilitation measure was the static strengthening and the restoration of the tightness of the old sewer.
Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: R. Stein